Home / Recruiter Center / Search Candidates / Civil Engineer
8 years experience
Qualification: Bachelor's Degree
Ajman, UAE, United Arab Emirates

Candidate Description

I wish to apply for the post of Assistant Project Manager. The position seems an ideal opportunity for me as it matches my experience, knowledge and career aspirations. As you can see from my CV, I have amassed over 8 years of significant, progressive experience in civil engineering projects within the Industrial and Power industries. During my career I have participated in more than 10 civil engineering projects, all of them were successful.

Skills and Expertise

OBJECTIVE :
Seeking to take up middle level managerial position in the field of Civil Engineering and take challenging, creative and diversified projects.

EXECUTIVE SUMMARY :
Have Eight years professional experience in Civil Engineering. Having equipped and expertise with various latest engineering tools and techniques, cost evaluation techniques and tools which I applied in my professional career to produce cost-effective solutions for the organization I worked with.

PRESENT EMPLOYER:

Presently working with M/s, TECTON Engineering and Construction LLC, Ajman – UAE as Contracts Engineer, in their construction division, with effect from March 2007


JOB RESPONSIBILITIES:

As a Contracts Engineer, I worked with diversified projects in civil engineering namely projects related to industrial projects. This gave me in depth understanding on business areas on all these areas. I used separate approach and techniques for each domain as the rules, code and costing techniques. I am a good team player and thereby could work well with the team of contractors and management and could implement the development as per design standards with quality and efficiency in stipulated time.

PROJECT HANDLED:

• 3M07 (1) – Pumping Stations and RCC Water Tank in Central Area at Masafi -FEWA.
• 8M06 – Mineral Water Bottling Plant at Ajman-FEWA.
• HPS/00/22875 – 20 MIGD RO Desalination Plant at Hamriyah Power Station-SEWA.
• 4M04 – 6 + 3 MIGD RO Desalination Plant New Qidfa and Al Zawrah-FEWA.
• FPS/0/06/0017564 - On-Shore Civil Works for the Construction of 5 MIGD RO Desalination Plant at Khorfakhan Power Station-SEWA.
• Construction Sewage Pumping Station and Pressure Main at Laborer Houses in F1 & F2 area at Mafarq-ADSSC.
• N-7430 - Construction of Twin DN 1600 CS pipeline from Tap off 12 A to Al Ain Reception complex-TRANSCO.
• 1M/05 - 4MIG and 2MIG RCC Ground water Tanks at Ras-Al-Khaimah and Ajman-FEWA.
• O1262 – Construction of Sewerage Connections & Related Works for Isolated Properties in the Western Region-ADSSC.
• E11/2005 - Construction of 33/11kV Substation buildings at Fujairah in Northern Emirates-FEWA.
• 4W/2011 – 2 x 10 MIG RCC Water Tanks and Pumping Station in Galilah at RAK, FEWA
• G+M+5 Storied Building & Associated External works for M/s. Royal Palace Furniture Industries at Ajman.
• Labor camp and Staff accommodation building and Central Stores G+2 in Ajman-TECTON.

KEY ROLES AT CORPORATE OFFICE:

• Organized to independent responsibility of Planning Department for preparation of Bar Charts, Construction Programs, Construction Planning, Cash Flow, identifying items on Critical Path, suggestive programs for Recovery Programs and other Planning related issues for project, by using MS-Project / Primavera P6
• Preparing the Revised Construction Programs and Cash Flow for submission and approval by clients and consultants, with prior approval by the management
• Coordinate with the Operations Teams for updating of factual progress achieved by company labors & Subcontractors
• Conducting the site meetings with site teams, where required, to record status of progress, delays (if any), suggestions for recovery and resource mobilization
• Confidentially apprise management about anticipated delays on any component of the project, requiring special attention
• Play a pro-active role in internal coordination meetings in preparing a professional Construction Program and Cash Flow of each project
• Coordinate with all concerned inter-departments including Contracts Department, Design Department, Technical Coordination Department, Purchase Department, Account department and others proper coordination
• Day to day project Monitoring
• Preparation of Micro level programme / Week look ahead programme
• Extra items rate analysis preparation (If required)
• Quantity Surveying & Estimating project BOQ
• Planning of Man, Material, Machinery, Money (Cash Flow) etc,
• Preparation the Budgets, Financial forecast, Scaffolding projection,
• Preparation Reconciliation reports for Bulk materials & Structural steel / TMT steels.
• Construction Material Procurement Schedule preparing & Monitoring
• Co-ordination with site teams for arrangements of Material , Manpower, Machineries
• Subcontractor / Agencies enquiries & quotation finalization.
• Monthly / Weekly Project Progress Report reviewing
• Co-ordination with GM / Manager Projects / Project Managers
• Attending the Client Review meeting with MD / GM / Manager Projects / Project Managers
• Construction Materials formal approvals obtain from the Client / Consultants.
• Co-ordination with Client / Consultant for all drawings issues, General site issues, QA/QC related issues etc,

TENDERS HANDLED:

• Construction of 10 MIGD RO Plant at Al Zawrah, for Federal Electricity and Water Authority, an estimated value of 190 Million AED.
• Supply & Installation of 3.3 US MGD SWRO Plant and Addition of 2 nd Pass to Existing 2 US MGD RO Plant at Delma Island, Abu Dhabi, for Abu Dhabi Distribution Company, an estimated value of 174 Million AED.
• Relocation of 3 MIGD RO Plant from New Qidfa-Fujairah to Al Zawrah- Ajman and Construction of New 7 MIGD RO Plant at Al Zawrah for the estimated value of 280 Million AED.
• Construction of Sewerage Connections and related works at Abu Dhabi Island and Main Land Phase II for the estimated value of 320 Million AED.
• Design Piling and Construction of 2 MIG RCC ground water storage tank at Kalba RO Plant for Sharjah Electricity and Water Authority, Sharjah, estimated value of 7.6 Million AED.
• Construction of Sewerage Connections & related works in Abu Dhabi Island & Main Land, for Abu Dhabi Sewerage Services Company, an estimated value of 476 Million AED.
• Construction of Sewage Treatment Plant -2, Main Pumping Station and Force Main at Saadiyat Island for Abu Dhabi Sewerage Service Company, Abu Dhabi an estimated value of 600 Million AED.
• Construction of 240 MIGD Reservoir and Pumping Station for Dubai Electricity and Water Authority, Dubai, estimated value of 2.46 Billion AED.
• 20 MIGD RO Desalination Plant at Hamriyah Power Station, estimated value of 440 Million AED.
• Construction Sewage Pumping Station and Pressure Main at Labourer in F2 area Houses at Mafarq, estimated value of 36 Million AED.
• Construction Sewage Pumping Station and Force Main at Labourer in F1 area Houses at Mafarq, estimated value of 36 Million AED.
• 40 MIGD Multi Effect Distillation Plant at Hamriyah., estimated value of 1.2 Billion AED
• 80 MIGD RO Desalination Plant at Hamriyah., estimated value of 3 Billion AED
• Construction of Sewerage Schemes for Al Shawamekh, Al Shahama, Al Bahya, Al Sadar and Trunk Sewer of falah and Shamkha Stage -3.
• 3 MIGD RO Desalination Plant at KALBA Power Station, estimated value of 28 Million AED.
• O – 1050 Miscellaneous Sewerage and Irrigation works at Al Kathim Phase III

WORKS INVOLVEMENT IN TENDER:

• Detailed Quantity working and Estimation.
• Floating Enquiry and Collecting Quote.
• Rate Analysis (Regarding Tender).
• Preparation for Tender Documents and Technical Data Sheets.
• Labour, Plant and Machinery & Staff histogram, Organization Chart preparation.
• Overall Schedule preparation
• Various Method of Statement Preparation
• Detailed Costing working with current market price
• Tender – Site visit and report submission

FROM 2006 JULY TO MARCH 2007:
Company Name : Consolidated Construction Consortium Ltd, Chennai, India.
Post : Exc. Junior Engineer.
Project : ASCENDAS PHASE II – IT Park at Taramani.

JOB RESPONSIBILITY:
• Daily Progress Report Preparation.
• Daily Working Status Preparation
• Actual Program vise working
• Shuttering and Reinforcement Checking
• Sub Contractor Bill Preparation.
• Site Monitoring with schedule.

FROM APRIL 2004 TO JUNE 2006:

Company Name : RPN ENGINEERS AND CONSTRUCTION PRIVATE LIMITED, Chennai, India.
Post : Site Engineer.
Project : 1. MRTS Projects at Greenways Railway station a t Chennai
2. Indian Express Office Building at Chennai

JOB RESPONSIBILITY:


Project No 1: MRTS Project:-

• Quality Control
• Client Bill preparation
• Sub Contractor bill preparation
• Site Execution (Controlling the labour and other resource arrangement)


Project No 2: Indian Express Office building:-
• Work along with actual program
• Site Execution (Controlling the labour and other resource arrangement)
• Quality Control
• Client Bill preparation
• Sub Contractor bill preparation

WORK EXPERIENCE:
Period Organization Worked as
March ’07 to Till to date M/s. Tecton Engineering & Construction llc, Ajman, UAE. Contracts Engineer
July ‘06 to March ‘07 M/s. Consolidated Construction Consortium Ltd, Chennai, India. Exc. Junior Engineer
April ‘04 to June ‘06 M/s. RPN Engineering Chennai Private Ltd, Chennai, India. Site Engineer


EDUCATION QUALIFICATION:
Course University / Year of Passing Marks Obtained
MBA in Project Management Alagappa University (Under Studying) -
BE in Civil Engineering Madurai Kamarajar University (Mepco Schlenk Engineering College) / 2004 April 78.5 %


SOFT SKILLS:

• Ms office
• Ms project
• Auto cad
• STADD pro – 2004
• Primavera p – 5,6.
• ERP package
• 3D – Studio Max.

Tags: Cost Engineer Contracts Engineer Estimator Quantity Surveyor (QS)

This profile has been viewed 51 times