Bajo de la Alumbrera Gold-Copper Mine

Bajo de la Alumbrera is located in the north-west of Argentina, in the province of Catamarca. The Alumbrera mining operation is one of the world's largest and lowest-cost gold and copper operations.

Brockville Solar Project

The Brockville solar project is located in the township of Elizabethtown-Kitley in Eastern Ontario and is being developed under Ontario’s Feed-in Tariff (FIT) Program. The energy produced by the Brockville Solar project will be sold to the Ontario Power Authority under a 20-year supply contract and will power the equivalent of 1,700 households annually.

Curtis LNG Project (QCLNG)

The Queensland Curtis LNG project is located on Curtis Island, Gladstone, in Queensland, Australia. The project development will comprise five components namely the gas field, pipeline, LNG plant, swing basin and channel, and shipping operations. The gas field component will involve expansion of coal seam gas operations in Surat Basin.

Genelba Combined Cycle Power Plant

Skanska LA, in consortium with Black & Veatchand SiemensAG, was contracted to perform the engineering, procurement and construction services for the Combined Cycle Power Plant GenelbaI project.

Ichthys Liquefied Natural Gas (LNG) Project

The Ichthys Project is a Joint Venture between INPEX Browse Ltd (76%, the Operator) and Total E&P Australia (24%). Gas from the Offshore Ichthys Field will be transported to onshore gas processing facilities in Darwin

Ichthys Onshore Production Facilities

The gas will be processed through a two train 8.4 t/a LNG processing plant. This production rate represents the average rate over the life of the Project. Total annual production will vary from year to year depending on factors such as the composition of the gas from the reservoir and the duration and frequency of maintenance activities.

Jazan Refinery

Saudi Aramco's new Jazan Refinery will be a grassroots facility with an anticipated capacity of up to 400,000 barrels per day (BPD). The proposed facility will be located in Jazan, Saudi Arabia. The Jazan Refinery and Terminal project is expected to support the future development of Jazan Economic City. The additional refined products from the new facility will satisfy the growth in domestic demand within the Kingdom of Saudi Arabia.

Los Bronces Copper Mine Expansion

The expansion of the Los Bronces copper mine is the largest mining job in Chile today. Located in the Andes northeast of Santiago, the project includes expansion of a copper concentrator, construction of a new concentrator, crushing and conveying equipment, grinding and flotation circuits, and other equipment. The project will more than double throughput at the facility.

Manifa Arabian Heavy Crude Project

The Manifa Project is both an Offshore and Onshore development. The Manifa Field is located in shallow waters and the development involved the construction of 27 drilling production islands and 2 water injection islands linked by a Causeway to the new Onshore Processing Facilities.

Marco Polo TLP

The Marco Polo TLP is installed in 1,311m (4,300 ft.) water depth in the Gulf of Mexico. The Marco Polo TLP has a displacement of approximately 27,400 short tons and a topside payload of 14,300 short tons. The deck is the largest single-lift deck installed offshore in the Gulf of Mexico. The Marco Polo TLP serves as the production hub platform at Green Canyon 608 in the Gulf of Mexico initially for Anadarko Petroleum Corporation's Marco Polo field discovery

Mariner Project

The Mariner Field is located on the East Shetland Platform of the UK North Sea approximately 150km east of the Shetland Isles. The Mariner oil field development entails investments of more than USD 7 billion and is the largest new offshore development in the UK in more than a decade and is expected to start production in 2017. The field is estimated to produce for 30 years, with average production of around 55,000 barrels of oil per day over the plateau period from 2017 to 2020.

Oveng TLP

The Oveng TLP serves the Oveng Field located approximately 55 km southwest of Bata and 250 km south of Malabo. The Oveng TLP is installed in approximately 280 meters (900 feet) of water. The platform is designed to support up to eighteen (18) top tensioned production and/or water injection direct vertical access risers and a tender-assist drilling unit.

Pearl GTL

Pearl GTL is comprised of upstream gas production facilities as well as an onshore GTL plant that will produce 140,000 barrels per day of high-quality GTL fuels and products along with 120,000 barrels of oil equivalent per day of condensate, liquefied petroleum gas and ethane. When constructed, it will be the largest GTL plant in the world.

Rabigh II

The proposed Rabigh II project comprises a new aromatics complex and an expanded facility to process 30 million standard cubic feet per day of ethane and approximately 3 million tons per year of naphtha as feedstock to produce a variety of high value-added petrochemical products. The project is expected to begin operations in the first half of 2016.

Sabine Pass Liquefaction Project

Sabine Pass Liquefaction Project has been initiated by Cheniere Energy Partners, under its subsidiary Sabine Pass Liquefaction, LLC to add liquefaction services at the Sabine Pass LNG receiving terminal.

Sabine Pass LNG Terminal

The Sabine Pass Terminal project in southern Louisiana is a phased project. Phase 1 of Sabine Pass LNG commenced service in April 2008 and by mid-2009 the first stage of the Phase 2 expansion was completed. With a total send-out capacity of 4.0 Bcf/d and 16.8 Bcf of storage capacity the Sabine Pass terminal is the largest receiving terminal, by regasification capacity, in the world.

Shenzi TLP

The Shenzi Tension Leg Platorm (TLP) has a payload capacity of 15,500st and displacement of 43,500st. The TLP is designed to have up to 20 subsea production and water injection wells tied back to the facility and is capable of processing 100,000 barrels of oil and 50 million cubic feet of gas per day. The TLP is designed to be installed in 1,333 meters water depth.

Taji Power Plant

Taji Power Plant has become the newest power project in the greater Baghdad area to begin producing electricity to help Iraq’s Ministry of Electricity (MOE) meet the country’s urgent energy needs. The Iraq MOE has commissioned the new facility, located 20 kilometers northeast of Baghdad, which recently entered commercial operation.

YASREF

YASREF is a new “grassroots” refinery with a capacity to process 400,000 bpd of Arabian Heavy crude and produce 90,000 bpd of gasoline, 263,000 bpd of ultra-low-sulfur diesel, 6,300 metric tons per day (mtd) of coke and 1,200 mtd of sulfur.