EPC Projects (Engineering, Procurement and Construction)
|
The Manifa Project is both an Offshore and Onshore development. The Manifa Field is located in shallow waters and the development involved the construction of 27 drilling production islands and 2 water injection islands linked by a Causeway to the new Onshore Processing Facilities. |
|
The Ichthys Project is a Joint Venture between INPEX Browse Ltd (76%, the Operator) and Total E&P Australia (24%). Gas from the Offshore Ichthys Field will be transported to onshore gas processing facilities in Darwin |
|
The Queensland Curtis LNG project is located on Curtis Island, Gladstone, in Queensland, Australia. The project development will comprise five components namely the gas field, pipeline, LNG plant, swing basin and channel, and shipping operations. The gas field component will involve expansion of coal seam gas operations in Surat Basin. |
|
The gas will be processed through a two train 8.4 t/a LNG processing plant. This production rate represents the average rate over the life of the Project. Total annual production will vary from year to year depending on factors such as the composition of the gas from the reservoir and the duration and frequency of maintenance activities. |
|
Pearl GTL is comprised of upstream gas production facilities as well as an onshore GTL plant that will produce 140,000 barrels per day of high-quality GTL fuels and products along with 120,000 barrels of oil equivalent per day of condensate, liquefied petroleum gas and ethane. When constructed, it will be the largest GTL plant in the world. |
|
The Yanbu Export Refinery Project (YERP) is a new “grassroots” refinery with a capacity to process 400,000 bpd of Arabian Heavy crude and produce 90,000 bpd of gasoline, 263,000 bpd of ultra-low-sulfur diesel, 6,300 metric tons per day (mtd) of coke and 1,200 mtd of sulfur. |
|
Bajo de la Alumbrera is located in the north-west of Argentina, in the province of Catamarca. The Alumbrera mining operation is one of the world's largest and lowest-cost gold and copper operations. |
|
The Marco Polo TLP is installed in 1,311m (4,300 ft.) water depth in the Gulf of Mexico. The Marco Polo TLP has a displacement of approximately 27,400 short tons and a topside payload of 14,300 short tons. The deck is the largest single-lift deck installed offshore in the Gulf of Mexico. The Marco Polo TLP serves as the production hub platform at Green Canyon 608 in the Gulf of Mexico initially for Anadarko Petroleum Corporation's Marco Polo field discovery |
|
The Shenzi Tension Leg Platorm (TLP) has a payload capacity of 15,500st and displacement of 43,500st. The TLP is designed to have up to 20 subsea production and water injection wells tied back to the facility and is capable of processing 100,000 barrels of oil and 50 million cubic feet of gas per day. The TLP is designed to be installed in 1,333 meters water depth. |
|
The Oveng TLP serves the Oveng Field located approximately 55 km southwest of Bata and 250 km south of Malabo. The Oveng TLP is installed in approximately 280 meters (900 feet) of water. The platform is designed to support up to eighteen (18) top tensioned production and/or water injection direct vertical access risers and a tender-assist drilling unit. |
|
Skanska LA, in consortium with Black & Veatchand SiemensAG, was contracted to perform the engineering, procurement and construction services for the Combined Cycle Power Plant GenelbaI project. |